The tools and materials a floor and paint crew reaches for, in plain English: what each one does, how to use it, the tricks experienced hands know, what goes wrong, and the safety points. Every entry has an animated 3D model, drawn as a generic shape and never a real product design. Tick what you own and build up a starter kit. Where the research could not confirm something, the page says so.
Kits above are crew groupings [P], not from the research. Check every number and rule against the product label, the maker sheet and the building official [C] before you rely on it.